WILLIAMS   PLT PAD            CAPACITY PLANNING                        2/03/92

 DSP01                        LOAD DETAIL INQUIRY                MACHINE DETAIL

                        LAST CP GENERATION DATE  0/00/00                       

                           FROM 12/01/94  TO 12/07/94                          

                                                                               

 Workcenter Number W20 HOLDING TANK                    W/C Capacity          96

 Department Number D10    Machine/Labor Paced   M      W/C Total Load        26

 Hours Per Day      08    Include Setup In Load Y      Percentage Load      27%

                                                                               

   Order  O                   Oper    Start    Due    --------Load---------    

   Number S  Part Number     No  Ln   Date     Date   Setup  Run  Total  %     

  M000519 F  PHILLIPS BIT    020 00 12/03/94 12/05/94    1     11    12  13    

  MOOO214 F  FLAT BIT        020 00 12/06/94 12/09/94    1     13    14  15    

                                                                               

                                                                               

                                                                               

                                                                               

                                                                               

                                                                               

                                                                                

                                                                               

 F2=Command          F3=Exit             F11=Labor Detail    F12=Load Summary  

 F13=Alternate Opers F14=LR Inquiry                                            

 

 

This screen displays all the scheduled operations that contribute to the outstanding workload for the requested workcenter/period. The total capacity and load for the period (shown in the top portion of the screen) are accumulated from the individual operations listed below.  The order status is shown for each operation listed, along with the scheduled start and due dates for the operation.

PLANT

Display only.  The plant where the workcenter is located.

LAST CP GENERATION DATE

Display only.  The date on which the generation of planned labor requirements was last performed.  The load information displayed will not reflect changes to the order schedule which have been made since this date.  You may wish to re-run the CP Generation to obtain the most up-to-date load picture.  If Shop Floor Control is installed, load due to open and firmed orders will be completely current.  That due to planned orders will be current only as of the last generation date.

FROM (START DATE)

Display only.  The first day in the period for which load is displayed.

TO (END DATE)

Display only.  The last day in the period for which load is displayed.

WORKCENTER NUMBER

Display only.  The workcenter for which load information is displayed.

DESCRIPTION

Display only.  Text used to identify the workcenter.  It is retrieved from the Workcenter File.

W/C CAPACITY

Display only.  The available capacity for the workcenter, after efficiency and utilization are taken into account.

DEPARTMENT NUMBER

Display only.  The department that is responsible for the workcenter.

MACHINE/LABOR PACED FLAG

Display only.  Indicates whether the workcenter is machine-paced (M) or labor-paced (L).

W/C TOTAL LOAD

Display only.  The total load placed on the workcenter during this period.

HOURS PER DAY

Display only.  The standard number of hours available to be worked at the workcenter each day.

INCLUDE SETUP IN LOAD

Display only.  Indicates whether the total load includes load caused by setup activities.  Values are Y (yes) and N (no).

PERCENTAGE LOAD

Display only.  The percentage of the capacity that is represented by the load.  It is calculated by dividing the total load by the workcenter capacity.  Any number greater than 100 indicates that the workcenter is over capacity for the period.

ORDER NUMBER

Display only.  The manufacturing order that is placing load on this workcenter during the period.

ORDER STATUS

Display only.  Indicates whether the order is currently planned (P), firmed (F), open (O), closed (C), or accounting closed (Z).

PART NUMBER

Display only.  The part that is being produced on this manufacturing order.

OPERATION NUMBER

Display only.  The step in the part's routing that is assigned to this workcenter.  The operation numbers indicate the sequence in which the routing steps are performed.

OPERATION LINE NUMBER

Display only.  If this field is not zero, the operation is an alternate operation.

START DATE

Display only.  The day work is scheduled to begin on the operation.

DUE DATE

Display only.  The day when the operation should be completed.

SETUP LOAD

Display only.  The amount of load caused by setting up the workcenter to run this operation.  Depending on the Include Setup in Load field, this may or may not be included as part of the total load for the operation.

RUN LOAD

Display only.  The amount of load caused by running this operation at the workcenter.

TOTAL LOAD

Display only.  If the Include Setup in Load field is Y, this field equals the setup load plus the run load.  If the Include Setup in Load field is N, this field equals the run load.

PERCENT LOAD

Display only.  The percentage of the workcenter's capacity that is taken up by this operation.  It is calculated by dividing the total load from this operation by the total capacity for the workcenter during the period.

SELECT

Optional.  To view possible alternate operations for a manufacturing order, type an X in this field and press F13.

COMMAND KEYS

Enter - Return to workcenter/period selection.

F2    - Display a window where a fast path option or mnemonic can be entered.  Fast path allows the next menu selection to be made directly from this screen.  When the window is displayed, pressing F3 will remove it.

F3    - Exit to menu (or return to summary inquiry).

F11   - Review machine or labor load detail for the same workcenter and time range.

F12   - Enter the Load Summary Inquiry program.

F13   - Review possible alternative operations for the one selected with an 'X'. These are retrieved from the routing for the ordered item.