Machine Load Summary Exceptions
CP500D
DATE 2/03/92 ANDERSEN SOFTWARE PAGE 1
TIME 8:55:11 PLANT BEL
REPORT CP500D LOAD SUMMARY EXCEPTION REPORT MACHINE
LAST CP GENERATION DATE 0/00/00
FROM 1/01/91 TO 2/03/92 REQUESTOR WILLIAMS
W/C DEPT M/L INCL EXCEPTION
NO WORKCENTER DESCRIPTION NO PACED SETUP PERCENT
--- ------------------------------ --- - - ---
WL1 LABOR PACED WORKCENTER - 1 D10 L Y 5
PERIOD NO OF ----------LOAD---------- EFFECT LOAD -------------PERCENTAGE LOAD-------------
END DAYS SETUP RUN TOTAL CAPACITY % 0 100 200
-------- --- --- ------ ------ ------ --- +---------+---------+---------+---------+
1/06/92 5 0 5 5 25 20 OOOO
** END OF WORKCENTER **
** END OF REPORT **
|
Purpose
This report provides machine setup and run load totals for any period where the load as a percentage of capacity exceeds the requested exception percentage.
If this exception condition exists when the Machine Load Summary Report (CP500B) is requested, this report is printed.
Report Sequence
Workcenter Number (if all workcenters are requested).