CP510B
DATE 2/03/92 PENNSKY MANUFACTURING COMPANY PAGE 1
TIME 13:13:26 PLANT PAD
REPORT CP510B LOAD DETAIL REPORT
LAST CP GENERATION DATE 0/00/00
REPORT PERIOD 12/01/94 TO 12/07/94 REQUESTOR WILLIAMS
MACHINE LOAD
W/C DEPT M/L HRS INCL EFFECT
NO WORKCENTER DESCRIPTION NO PACED DAY SETUP CAPACITY
--- ------------------------------ --- - -- - ------
W20 HOLDING TANK D10 M 08 Y 96
ORDER O OPER START DUE -----------LOAD-----------
NO S PART NUMBER UM NO LN OPERATION DESCRIPTION DATE DATE SETUP RUN TOTAL %
------- - --------------- -- --- -- ------------------------------ -------- -------- --- ----- ----- ---
M000519 F PHILLIPS BIT EA 020 00 DIP BITS IN OXIDE SOLUTION 12/03/94 12/05/94 1 11 12 13
MOOO214 F FLAT BIT EA 020 00 DIP BITS IN OXIDE SOLUTION 12/06/94 12/09/94 1 13 14 15
--- ----- ----- ---
WORKCENTER TOTALS 2 24 26 27
--- ----- ----- ---
** END OF REPORT **
|
Purpose
This report provides detailed machine load information at the operation and workcenter levels. The load percentage is calculated for each operation.
This report is requested on the Load Detail Report Request Screen (CP310S02). This report is also printed if a load percentage exception occurs during the Load Summary Report Program (CP500E).
Report Sequence
Workcenter Number, Order Status, Operation Start Date, Order Number.