Machine Load Detail

CP510B

 


 

DATE    2/03/92                              PENNSKY MANUFACTURING COMPANY                                                PAGE    1

TIME   13:13:26                                                                                                          PLANT   PAD

REPORT CP510B                                           LOAD DETAIL REPORT

                                                 LAST CP GENERATION DATE  0/00/00

                                                REPORT PERIOD 12/01/94 TO 12/07/94                 REQUESTOR    WILLIAMS

                                                           MACHINE LOAD

                           W/C                                   DEPT    M/L    HRS   INCL     EFFECT

                           NO    WORKCENTER DESCRIPTION           NO    PACED   DAY   SETUP   CAPACITY

                           ---   ------------------------------   ---     -      --     -      ------

                           W20   HOLDING TANK                     D10     M      08     Y          96

 ORDER     O                           OPER                                       START      DUE      -----------LOAD-----------

  NO       S   PART NUMBER       UM   NO  LN   OPERATION DESCRIPTION              DATE       DATE     SETUP   RUN    TOTAL    %

 -------   -   ---------------   --   --- --   ------------------------------   --------   --------    ---   -----   -----   ---

 M000519   F   PHILLIPS BIT      EA   020 00   DIP BITS IN OXIDE SOLUTION       12/03/94   12/05/94      1      11      12    13

 MOOO214   F   FLAT BIT          EA   020 00   DIP BITS IN OXIDE SOLUTION       12/06/94   12/09/94      1      13      14    15

                                                                                                       ---   -----   -----   ---

                                                                                WORKCENTER TOTALS        2      24      26    27

                                                                                                       ---   -----   -----   ---

                                                                              **  END OF REPORT **

Purpose

This report provides detailed machine load information at the operation and workcenter levels.  The load percentage is calculated for each operation.

This report is requested on the Load Detail Report Request Screen (CP310S02).  This report is also printed if a load percentage exception occurs during the Load Summary Report Program (CP500E).

Report Sequence

Workcenter Number, Order Status, Operation Start Date, Order Number.