CP500C
DATE 2/03/92 ANDERSEN SOFTWARE PAGE 1
TIME 8:55:11 PLANT BEL
REPORT CP500C LOAD SUMMARY EXCEPTION REPORT LABOR
LAST CP GENERATION DATE 0/00/00
FROM 1/01/91 TO 2/03/92 REQUESTOR WILLIAMS
W/C DEPT M/L INCL EXCEPTION
NO WORKCENTER DESCRIPTION NO PACED SETUP PERCENT
--- ------------------------------ --- - - ---
TMP TEST WORKCENTER D10 L Y 5
PERIOD NO OF ----------LOAD---------- EFFECT LOAD -------------PERCENTAGE LOAD-------------
END DAYS SETUP RUN TOTAL CAPACITY % 0 100 200
-------- --- --- ------ ------ ------ --- +---------+---------+---------+---------+
11/18/91 5 0 60 60 80 75 OOOOOOOOOOOOOOO
12/02/91 5 0 96 96 76 126 OOOOOOOOOOOOOOOOOOOOOFFFF
12/09/91 5 0 114 114 60 190 OOOOOOOOOOOOOOOOOOOOOOOOOOOFFFFFFFFFFF
** END OF WORKCENTER **
** END OF REPORT **
|
Purpose
This report provides labor setup and run load totals for any period where the load as a percentage of capacity exceeds the requested exception percentage.
If this exception condition exists when the Labor Load Summary Report (CP500A) is requested, this report is printed.
Report Sequence
Workcenter Number (if all workcenters are requested).