Labor Load Detail

CP510A

 


 

DATE    2/03/92                              ANDERSEN SOFTWARE                                                            PAGE    1

TIME    8:54:40                                                                                                          PLANT   BEL

REPORT CP510A                                           LOAD DETAIL REPORT

                                                 LAST CP GENERATION DATE  0/00/00

                                                REPORT PERIOD  1/01/91 TO  2/03/92                 REQUESTOR    WILLIAMS

                                                           LABOR LOAD

                           W/C                                   DEPT    M/L    HRS   INCL     EFFECT

                           NO    WORKCENTER DESCRIPTION           NO    PACED   DAY   SETUP   CAPACITY

                           ---   ------------------------------   ---     -      --     -      ------

                           IAL   LABOR-PACED WORKCENTER           D10     L      08     Y           0

 ORDER     O                           OPER                                       START      DUE      -----------LOAD-----------

  NO       S   PART NUMBER       UM   NO  LN   OPERATION DESCRIPTION              DATE       DATE     SETUP   RUN    TOTAL    %

 -------   -   ---------------   --   --- --   ------------------------------   --------   --------    ---   -----   -----   ---

 IA00001   O   IA-MFG            EA   010 00   LABOR PACED OPERATION            12/03/91   12/03/91      0       4       4   999

 MBM0002   O   SYV-SHIP-9        EA   010 00   ASSEMBLAGE                        1/06/92    1/06/92      0       2       2   999

 BDS       O   BOLT-200          EA   010 00   STANDARD OPERATION                1/15/92   10/29/96      0      92      92   999

                                                                                                       ---   -----   -----   ---

                                                                                WORKCENTER TOTALS        0      98      98   999

                                                                                                       ---   -----   -----   ---

                                                                              **  END OF REPORT **

Purpose

This report provides detailed labor load information at the operation and workcenter levels.  The load percentage is calculated for each operation.

This report is requested on the Load Detail Report Request Screen (CP310S02).  This report is also printed if a load percentage exception occurs during the Load Summary Report Program (CP500E).

Report Sequence

Workcenter Number, Order Status, Operation Start Date, Order Number.