Labor Load Detail
CP510A
DATE 2/03/92 ANDERSEN SOFTWARE PAGE 1
TIME 8:54:40 PLANT BEL
REPORT CP510A LOAD DETAIL REPORT
LAST CP GENERATION DATE 0/00/00
REPORT PERIOD 1/01/91 TO 2/03/92 REQUESTOR WILLIAMS
LABOR LOAD
W/C DEPT M/L HRS INCL EFFECT
NO WORKCENTER DESCRIPTION NO PACED DAY SETUP CAPACITY
--- ------------------------------ --- - -- - ------
IAL LABOR-PACED WORKCENTER D10 L 08 Y 0
ORDER O OPER START DUE -----------LOAD-----------
NO S PART NUMBER UM NO LN OPERATION DESCRIPTION DATE DATE SETUP RUN TOTAL %
------- - --------------- -- --- -- ------------------------------ -------- -------- --- ----- ----- ---
IA00001 O IA-MFG EA 010 00 LABOR PACED OPERATION 12/03/91 12/03/91 0 4 4 999
MBM0002 O SYV-SHIP-9 EA 010 00 ASSEMBLAGE 1/06/92 1/06/92 0 2 2 999
BDS O BOLT-200 EA 010 00 STANDARD OPERATION 1/15/92 10/29/96 0 92 92 999
--- ----- ----- ---
WORKCENTER TOTALS 0 98 98 999
--- ----- ----- ---
** END OF REPORT **
|
Purpose
This report provides detailed labor load information at the operation and workcenter levels. The load percentage is calculated for each operation.
This report is requested on the Load Detail Report Request Screen (CP310S02). This report is also printed if a load percentage exception occurs during the Load Summary Report Program (CP500E).
Report Sequence
Workcenter Number, Order Status, Operation Start Date, Order Number.