Outside Processed Operations
Outside processed operations do not have operation types or the elements of scheduled lead time associated with them. The "lead time" is defined on the routing record in number of days. As with fixed time operations, the total quantity is assumed to be available at the start of the operation, to be required for the duration of the operation, and to be totally available when the operation is complete.