 DATE   12/31/99                                                                                **  DEMAND**             PAGE       1

 TIME   11:42:44                              BERLIN                                            CUTOFF 12/10/99              CO   001

 REPORT IA600A                                     WIP DETAIL BY ACCOUNTING CODE                                             LOC  BER

                                                                                          REQUESTOR MURRAY                   PLT  WH1

 ACCOUNTING CODE:

   PART NUMBER        DESCRIPTION            ORDER NO.  O/S       START      DUE      ORDER QTY   RECEIPT QTY   SCRAP QTY    V S

 --------------- -------------------------   ---------  ---     --------  --------   -----------  -----------  -----------   - -

 BIKE            BIKE                        BIKE-1     O       31/12/00  16/01/01       100.000         .000         .000   1 1

 BEGINNING BALANCE      STD COST CHANGES        TRANSACTIONS       SCRAP/EFF VARIANCE        VARIANCES           ENDING BALANCE

 ------------------    ------------------    ------------------    ------------------    ------------------    ------------------

 MAT            .00    ISS            .00    ISS            .00    SCR            .00    M/P            .00    MAT            .00

 LBR            .00    LBR            .00    LBR            .00    LBR            .00    M/E            .00    LBR            .00

 BUR            .00    BUR            .00    BUR            .00    MAN            .00    EFF            .00    BUR            .00

 MSC            .00    MSC            .00    MSC            .00    BUR            .00    MAN            .00    MSC            .00

 ------------------    RCT            .00    RCT            .00                          BUR            .00    ------------------

                .00                                                                      MSC            .00                   .00

   PART NUMBER        DESCRIPTION            ORDER NO.  O/S       START      DUE      ORDER QTY   RECEIPT QTY   SCRAP QTY    V S

 --------------- -------------------------   ---------  ---     --------  --------   -----------  -----------  -----------   - -

 BIKE            BIKE                        BIKE-4     O       31/12/00   4/01/01       100.000         .000         .000   1 1

 BEGINNING BALANCE      STD COST CHANGES        TRANSACTIONS       SCRAP/EFF VARIANCE        VARIANCES           ENDING BALANCE

 ------------------    ------------------    ------------------    ------------------    ------------------    ------------------

 MAT            .00    ISS            .00    ISS            .00    SCR            .00    M/P            .00    MAT            .00

 LBR            .00    LBR            .00    LBR            .00    LBR            .00    M/E            .00    LBR            .00

 BUR            .00    BUR            .00    BUR            .00    MAN            .00    EFF            .00    BUR            .00

 MSC            .00    MSC            .00    MSC            .00    BUR            .00    MAN            .00    MSC            .00

 ------------------    RCT            .00    RCT            .00                          BUR            .00    ------------------

Purpose

The Work-In-Process Detail By Accounting Code Report shows a detail listing by part of the activity reported against each manufacturing order for the period sorted by accounting code.  The report is similar to the Work-In-Process Summary Report (IA130A).

The beginning balance is the sum of all transactions against the manufacturing order.  The following components of the beginning balance are shown:  material, labor, burden, and miscellaneous cost.  The current period's activity is shown by issues, labor, burden, miscellaneous cost, and receipts.

If the manufacturing order was closed for Inventory Accounting (status = Z) during the period end post, closure variances are calculated and displayed.  If as-incurred variances are used, scrap/efficiency variances are also calculated and displayed.

The ending balance is the sum of the beginning balance, this period activity, and the variances.  The following components of the ending balance are also shown:  material, labor, burden, and miscellaneous cost.  The Cutoff field will be displayed only in a demand post or trial demand (where the cutoff date is filled in).

Report Sequence

Company/location, plant, accounting code, part number, manufacturing order.