Note that overhead is referred to interchangeably as "overhead" and "burden" throughout the software.
Standard Overhead Cost
=
(Std Machine Hrs * Machine-Based Overhead Rate) +
(Std Labor Hrs * Labor-Based Overhead Rate)
Actual Overhead Cost
(Actual Machine Hrs * Machine-Based Overhead Rate) +
(Actual Labor Hrs * Labor-Based Overhead Rate)