Requisitions by Last Action Date
PO580A
DATE 5/23/94 ANDERSEN CONSULTING APPLICATIONS, INC PAGE 1
TIME 9:00:51 MANUFACTURING SITE 1 CO 001
REPORT PO580A BUYER WHS BEL
REQUESTOR WILLIAMS
REQUISITIONS BY LAST ACTION DATE
REQUISITION PLANNER ---- BUYER ---- PRIORITY
CO WHS STATUS FROM DATE TO DATE FROM TO CODE FROM TO CODE
001 BEL R 5/01/94 5/31/94
ACTION PTY DUE REQUISITION L REQ PLN PREF UNCOVERED
DATE CDE DATE NUMBER LN S PART NUMBER PART DESCRIPTION RQS QTY UM DPT CDE VENDOR QUANTITY
-------- - -------- ------- -- - --------------- ------------------------- ---------- -- --- --- -------- -----------
5/10/94 B 5/16/94 R10 1 R PURCFGPART CONFIGURED PUR PART 2.000 EA A V01 2.000
CONFIG CODE CONFIGURED PART C: RED L: 8 W: 10 H: 12
5/11/94 B 5/17/94 R09 1 R PURCFGPART CONFIGURED PUR PART 2.000 EA A V01 2.000
CONFIG CODE CONFIGURED PART C: YELLOW L: 20 W: 30 H: 40
5/12/94 B 5/18/94 R1 3 R PURCFGPART CONFIGURED PUR PART 1.000 EA A V01 1.000
CONFIG CODE CONFIGURED PART C: BLUE L: 8 W: 9 H: 8
5/12/94 B 5/18/94 R1 4 R PURCFGPART CONFIGURED PUR PART 1.000 EA A 1.000
CONFIG CODE CONFIGURED PART C: GREEN L: 8 W: 15 H: 12
5/16/94 B 5/16/94 R02 3 R BOLT-300 TRANSFER PART 2800.000 EA B 2800.000
5/16/94 B 5/16/94 R04 1 R BOLT-100 PURCHASING PART 135.000 EA A 135.000
5/16/94 B 5/16/94 0000013 2 R BOLT-100 PURCHASING PART 1000.000 EA A V01 1000.000
5/17/94 B 5/17/94 R02 4 R BOLT-100 PURCHASING PART 135.000 EA B V01 135.000
5/18/94 B 5/18/94 R02 1 R BOLT-100 PURCHASING PART 5000.000 EA B V01 5000.000
ADD ANOTHER REQUISITION FOR PLANNER A
5/18/94 B 5/18/94 R1 1 R BOLT-200 MANUFACTURED PART 1.000 EA A 1.000
5/18/94 B 5/18/94 R1 2 R BOLT-200 MANUFACTURED PART 1.000 EA A 1.000
5/18/94 B 5/18/94 R1 5 R BOLT-200 MANUFACTURED PART 10.000 EA A 10.000
5/18/94 B 5/18/94 R1 6 R BOLT-200 MANUFACTURED PART 10.000 EA A 10.000
5/18/94 B 5/18/94 R1 7 R BOLT-200 MANUFACTURED PART 10.000 EA A 10.000
5/18/94 B 5/18/94 0000013 1 R BOLT-100 PURCHASING PART 125.000 EA A V01 125.000
5/19/94 B 5/19/94 R02 2 R BOLT-200 MANUFACTURED PART 8000.000 EA B 8000.000
ENTER THE NUMBER THAT IS BEING COVERED BY REQ
PART NUMBER BOLT-200 IS A MANUFACTURED PART
5/20/94 B 5/20/94 R01 7 R BOLT-200 MANUFACTURED PART 10.000 EA A V01 10.000
5/20/94 B 5/20/94 R01 10 R BOLT-100 PURCHASING PART 167.500 EA A V01 167.500
5/20/94 B 5/20/94 R01 11 R BOLT-200 MANUFACTURED PART 10.000 EA A V01 10.000
BUYER : TOTAL NUMBER OF REQUISITIONS LINES 20
** END OF REPORT **
|
Purpose
This report provides a detailed listing of requisition lines. Only requisitions that meet the user-specified selection criteria are listed. They are listed by buyer in due date sequence within a company/warehouse. If the part is configured, the configuration code will be displayed. It should be noted that requisitions with blank planner codes will always be included on the report. The first line of data across the top of the report lists the selection criteria that were entered for the report.
Report Sequence
Company, Warehouse, Buyer Code, Last Action Date, Priority Code, Due Date, Requisition Number, Requisition Line Number.